The FAIR package
What ASdrawn fills, and what stays yours.
ASdrawn exports an AS9102 Rev C FAIR workbook (Forms 1, 2 and 3 in one Excel file), the drawing with every balloon burned in, and a Net-Inspect Form 3. Below, field by field, is what it reads from the drawing and what your organisation completes. Planning the FAI, measuring the part, verifying every characteristic and signing the report stay with you.
Download a finished sample
These are the files ASdrawn exports for its demo run after our review corrections: drawing AD-1004, actuator gear housing, a synthetic part we drew ourselves, so no customer data is in them. It is the same run the live demo opens. Results and sign-off are blank because no part was measured. No email, no sign-up.
This is a reviewed package, not raw AI output. Before exporting it we corrected, as your reviewer would: instance counts, linked groups, boxed basic dimensions, one thread depth, one misread symbol, balloon placement.
FAIR workbook
AS9102 Rev C Forms 1, 2 and 3 (Excel)
Download .xlsx · 16 KBBallooned PDF
The drawing with every balloon burned in
Download .pdf · 48 KBNet-Inspect Form 3
Form 3 rows in Net-Inspect's Excel import layout
Download .xlsx · 10 KB
Form 3 in the sample has 130 rows, more than the drawing has balloons: a balloon that covers several requirements, or a feature repeated in several places, gets a row for each.
Form 1 — Part number accountability
The title block fills the part and drawing identity. Everything about this FAI, this order and its sign-off is yours: fill it in the editor before you export, or in the workbook afterwards.
| Field | Name | Filled by |
|---|---|---|
| 1 | Part NumberRequired | ASdrawn, from the drawingFrom the title block. |
| 2 | Part NameRequired | ASdrawn, from the drawingFrom the title block. |
| 3 | Serial NumberConditionally required | You |
| 4 | FAIR IdentifierRequired | You |
| 5 | Part Revision LevelConditionally required | Pre-filled; you confirmFollows the drawing revision; change it if your part revision differs. |
| 6 | Drawing NumberConditionally required | ASdrawn, from the drawingFrom the title block. |
| 7 | Drawing Revision LevelConditionally required | ASdrawn, from the drawingFrom the title block. |
| 8 | Additional ChangesConditionally required | You |
| 9 | Manufacturing Process ReferenceRequired | You |
| 10 | Organization NameRequired | Pre-filled; you confirmPre-filled from the title block; you confirm. AS9102 normally wants your organisation here, and the title block often names the design authority. |
| 11 | Supplier CodeOptional | You |
| 12 | Purchase Order NumberOptional | You |
| 13 | Detail/AssemblyRequired | Pre-filled; you confirmStarts as Detail. |
| 14 | Full FAI/Partial FAIRequired | Pre-filled; you confirmStarts as Full FAI. For a partial FAI, tick Partial and fill the baseline part number and the reason. |
| 15 | Part Number (Assembly Index)Conditionally required | YouAssembly FAIRs only. |
| 16 | Part Name (Assembly Index)Conditionally required | YouAssembly FAIRs only. |
| 17 | Part Type (Assembly Index)Conditionally required | YouAssembly FAIRs only. |
| 18 | FAIR Identifier (Assembly Index)Conditionally required | YouAssembly FAIRs only. |
| 19 | Does FAIR Contain a Documented Nonconformance(s)?Required | You |
| 20 | FAIR Verified ByRequired | YouSign-off stays with your organisation. |
| 21 | Date (FAIR Verified)Required | You |
| 22 | FAIR Reviewed/Approved ByRequired | YouSign-off stays with your organisation. |
| 23 | Date (FAIR Reviewed/Approved)Required | You |
| 24 | Customer ApprovalConditionally required | You |
| 25 | Date (Customer Approval)Conditionally required | You |
| 26 | CommentsOptional | You |
Form 2 — Product accountability
Materials, special processes and functional tests called out in the drawing notes become rows. Suppliers, approvals and certificates come from your records.
| Field | Name | Filled by |
|---|---|---|
| 1–4 | Part number, part name, serial number, FAIR identifier | Pre-filled; you confirmCarried from Form 1: part number and name from the drawing, serial number and FAIR identifier from you. |
| 5 | Material or process name | ASdrawn, from the drawingOne row per material and process specification in the drawing notes. |
| 6 | Specification number | ASdrawn, from the drawingFrom the same note. |
| 7 | Code | Pre-filled; you confirmPre-filled per row; check it. |
| 8 | Supplier | You |
| 9 | Customer approval verification | You |
| 10 | Certificate of conformance number | You |
| 11 | Functional test procedure number | ASdrawn, from the drawingWhen the drawing notes call one out; otherwise yours. |
| 12 | Acceptance report number | YouPre-filled only when the drawing notes give one. |
| 13 | Comments | You |
Form 3 — Characteristic accountability
One row per requirement, numbered to match its balloon on the PDF. You add the measured results.
| Field | Name | Filled by |
|---|---|---|
| 1–4 | Part number, part name, serial number, FAIR identifier | Pre-filled; you confirmCarried from Form 1. |
| 5 | Characteristic number | ASdrawn, from the drawingThe balloon number; the ballooned PDF carries the same numbers. |
| 6 | Reference location | ASdrawn, from the drawingSheet, zone and view of the callout. |
| 7 | Characteristic designator | ASdrawn, from the drawingKey, Critical or Safety, where the characteristic is classed that way; otherwise blank. |
| 8 | Requirement | ASdrawn, from the drawingNominal and tolerance, GD&T frame, or note text, as drawn. |
| 9 | Results | YouYour measured values. |
| 10 | Designed / qualified tooling | You |
| 11 | Nonconformance number | You |
| 12 | Additional data / comments | Pre-filled; you confirmASdrawn adds context such as "4 PLACES", instance numbers, a general tolerance it applied, and characteristic notes; add your own. |
Partial FAI
Form 1 carries Full or Partial FAI (field 14), the baseline part number and the reason for a partial FAI; you set them. Revision compare overlays two revisions of a drawing, carries your balloon numbering across and flags characteristics that don’t match, which helps you decide what a partial FAI must cover. The decision, and which rows go in the report, stay yours.
Try it on the demo drawing, then on yours
The live demo is the trial: try the editor on a real run, with no account. Nothing you do is saved; data exports need an account. Sign up when you want to run your own drawings. Building FAIRs by hand for now? The blank AS9102 Rev C template is free.