Job cost calculator

50 parts at A$120 an hour, with a 1.5 h set-up, a 6 min cycle and A$8.50 of material each, cost A$24.10 a part; with 25 % markup they sell at A$30.13. One part alone sells at A$250.63. Enter your shop’s machine-hour rate, the set-up and cycle times, the material, any outside costs, a scrap allowance and your markup for the cost and price a part, the batch price and the machine hours.

The cost a part is drawn against the batch size, and the price break table loads any batch size into it.

Price a part
Cost a part
Set-up a part
Run time a part
Material a part
Batch price, 50 parts
Margin
20.0%
Machine hours
6.50h
How it’s calculated

R the machine-hour rate, ts the set-up (h), Co outside costs, tc the cycle (min), m the material a part, q the good parts and n = ⌈q / (1 − scrap)⌉ the parts started. Price = cost × (1 + markup); margin = markup / (1 + markup). Here: (120.00 × 1.5 + 0.00) / 50 + 12.00 × 50/50 + 8.50 × 50/50 = 24.10; × 1.250 = 30.13.

BatchSet-up a partRun a partMaterial a partCost a partPrice a partBatch price
1180.0012.008.50200.50250.63250.63
536.0012.008.5056.5070.63353.13
1018.0012.008.5038.5048.13481.25
257.2012.008.5027.7034.63865.63
503.6012.008.5024.1030.131506.25
1001.8012.008.5022.3027.882787.50
2500.7212.008.5021.2226.526631.25
5000.3612.008.5020.8626.0713037.50
10000.1812.008.5020.6825.8525850.00

Why does a small batch cost so much more a part?

The set-up is paid once whatever the batch: spread over 5 parts it is twenty times what it is over 100. Material and run time are paid on every part, so they stay flat. That is why a quote should give a price for each batch size, and why the set-up time is the first thing to cut when small batches are the work.

DerivedVerify against the governing standard before you rely on a number.Sources

Computed from the inputs: set-up spread over the good parts, run time and material on every part started, markup on cost

Limitation: Your machine-hour rate must already carry the machine, the operator and the overhead: nothing is added for them here.

Limitation: Inspection, programming, packing and freight are not counted unless you add them to the outside costs.

Values follow the governing standard, which is authoritative for production and inspection decisions.